If your project includes new hardwood, laminate or engineered hardwood flooring materials, we can install them as well as handle the additional work that goes along with new flooring, if needed such as:
1. Removal and disposal of old flooring materials
2. Removal and disposal (or hold for reinstall) of existing base moulding.
3. Floor preparation including floor leveling and installation of required underlayment.
4. Installation of flooring materials.
5. Installation of new base moulding or reinstall existing base moulding.
6. Clean up and disposal of all debris in an approved landfill.
Contact us for a free estimate on your flooring project.